In another bid to continuously challenge the complexity of the operations , A selected service have being put as a trial run in order to further boast the productivity. This is the first set up and we shall tune up as the process progressively build up
The objective of this trial run is to reflect as much as possible a supply and demand from each yard block to each cranes
This first set up is to provide at least the minimum requirement for each cranes at specific blocks
Service : SW
Each Setup will go by specific slot per Equipment type and per POD , each identified below blocks have a specific slots for each cranes requirement
Identified blocks as below :
Block 18A and 18E ~ for all boxes meant for Forward Crane
Block 17E and 17B ~ for all boxes meant for middle Crane1
Block 18C and 16B ~ for all boxes meant for middle Crane2
Block 18A and 108E ~ for all boxes meant for Aft Crane
Another setup is on the pairing of reefers and dry
A selected slots at block 14K for each POD have being created
With this all SAW reefers should be plan from block 06 and above only!
Apart from 8 blocks above , an extra blocks created in order to widen the choices and creates more flexibility